Hi Guys,

Other application software uses Control + Shift + S to display the SaveAs dialog window.
I believe Qelectrotech changes to pan mode when the Ctr+Shft+S keyboard combination is pressed.

Is this a setting I can adjust or is it a programming modification?

Thanks.

Hi Guys,

I have project with approx 100 folios. 

Moving the folios up or down the project tree using F3, F4 or jump 10 works but is very slow.
Could the a mechanism be implemented to  drag and drop the folio to a new position.
(or I should be more accurate with planning)
(or perhaps there is a way that I am not aware of)

Example 1
if folio 50 was required in position 11 then the folio (50) is clicked & dragged up the project tree using the mouse and placed on folio 10.  The program re-positions the folio from 50 to 11.

Note the folio is placed one position greater than the position required.

Example 2
if folio 2 is required in position 1 then the folio (1) is clicked & dragged down the project tree using the mouse and placed on folio 2.   The program re-positions the folio from 1 to 2.

Hopefully, the above makes sense and is of use.
Other wise I have been learning the program during this project my first, and the program is very very good. Thank you to the developers.

I did find this

Cable ID

Would it be this information that can exported?

Is there a way to create a list/table within Qelectrotech?

Thanks.

Hi David,

Sorry I cant help with your problem.

What is make and model of the terminal blocks  in the picture?

Regards,
Trevor

Hi,


Sorry I have not found a resource to assist with....
How do I create a cable list / cable schedule? 
Can I make a page with IO (Controller Inputs and Outputs)  Listing?

PS: Great software. Love using it.

Thanks,
Tray